Virtual Tour and Drawings

CENTRAL CAMPUS EXPANSION PLANS

Our Central Campus expansion is progressing rapidly and set to open sometime in the Fall of 2023.

For more detailed timelines visit here and for and monthly construction updates visit here.


CENTRAL CAMPUS EXPANSION FLOORPLANS


The expansion to Central Campus will include four floors including a mezzanine level (2nd floor). The fourth floor will be completed at a future date.


RENOVATIONS

Starting soon there will be an extensive renovation phase occurring in our current Central Campus facility.

For detailed timelines and phases of these renovations, and how they may impact you, please visit our Renovation Timelines and Phases page.

In summary several renovations will or have occurred in our existing spaces including:

  • SW corner, main floor (existing Children’s Ministry) will feature: a new Special Needs Ministry area including three classrooms, washrooms and reception area; new early Children’s Ministry room and mothers’ room and a new entrance corridor from the existing atrium into the expansion.
  • SW corner, second floor (existing Children’s Ministry) will include a renovation for a new multi-purpose area and increased washroom space across from the Chapel.
  • Main floor atrium bathrooms: We will be renovating the main floor atrium washrooms
  • SE corner, second floor (existing office area) will include a renovation to develop two new meeting rooms.

Renovations required to integrate the existing facility with the new facility:

  • NW corner will integrate the new “Centre for the City” which will house our Compassion ministry and our New Canadian Friendship Centre.
  • NE corner will integrate ministries that are currently housed in the northwest corner (such as technical services) and add some multi-purpose rooms,
  • Worship Center renovations included ceiling catwalk drywall removal, ceiling steel reinforcement; and,
  • platform renovation.

On the exterior the south lawn has been turned into parking as some of the current parking on the northwest side will be used for the expansion. Overall, parking will increase by ~200 spaces. We will be adding another entrance to the parking lot from 38th Ave.


CENTRAL CAMPUS EXTERIOR RENDERING

BEARSPAW CAMPUS

BEARSPAW CAMPUS FLOOR PLANS

The outside of the property will feature 468 parking stalls (available on opening day). An additional 210 parking stalls will be available in a future expansion.


FIRST FLOOR PLANS

 

  1. A multi-purpose space that will serve as a worship centre that at full occupancy seats approximately 700 people. We anticipate even more growth once this new capacity is available and we’re excited to see what God has in store for the lives of each person filling each seat! When not being used for worship, the space can be used as a gym or for other purposes.
  2. An atrium featuring a rustic fireplace and beautiful views of the mountains facilitate community connection and coffee service before and after Sunday services and other events.
  3. A prayer room seating 30 will be available next to the worship centre.

SECONDARY FLOOR PLANS

  1. A chapel with 114 seats. We anticipate using this space for prayer meetings, teaching / classes and smaller services, weddings etc.

LOWER LEVEL PLANS

  1. Children’s Ministry rooms: eleven rooms will be available for Children’s Ministry including four classrooms, three multi-purpose spaces, an infants’ room, toddlers’ room, mothers’ nursery space and a play structure area where families can connect while children play.
  2. The multipurpose spaces will be available for additional ministry purposes, such as adult and youth meetings and discipleship throughout the week.

EXTERIOR RENDERING – BEARSPAW CAMPUS (NORTHWEST CAMPUS)

Additional Information

0

Total Building Area in square feet

0

Shrubs Being Planted

0

Building Footprint in Square Feet

0

Trees Being Planted